Broadgates Avenue Steel Frame – Roof Structure

Structural steel frame installation in progress at Broadgates Avenue, Barnet, showing multiple UB sections and crank frames forming the roof structure within a fully scaffolded work area.
Our team installed a series of UB 203 x 133 beams and crank frames with precise alignment to form this complex roof structure.

This photo captures the Broadgates Avenue project during the installation phase, highlighting the careful positioning of beams and crank frames. The frame is fully primed, aligned, and ready for follow-on trades, showcasing the precision and stability required for a loft conversion of this scale.

X

contact IconGet in touch

Request A Quote