BBC Elstree: a 50-tonne steel frame
Nearly 50 tonnes of steel fabricated in stages and erected by our mobile welding team, using SHS, UC, UB, PFC and RHS sections.
About this project
This nearly 50-tonne steel project posed a considerable challenge for our team, requiring fabrication in stages and erection by our mobile welding team. The structure comprised a variety of steel sections, including SHS, UC, UB, PFC, and RHS beams, with the heaviest component weighing 7,849 kg and measuring over 335 meters in length. This project involved fabricating steel structures that allowed the client to create mezzanine floors within a film studio. The aim was to divide a single floor into two usable levels, as the ceiling height was sufficient to accommodate the additional space. We worked closely with Henny Ltd. to ensure that the client’s requirements were fully met.
To streamline the process, our in-house systems ensured the steel fabrication was carried out with precision and within the necessary tolerances.

Project images


Similar work
Commercial steel installation
See how we handle projects like this. Find out more →
More case studies
Browse other projects we have delivered. All case studies →
Send your drawings
Get a price for your own project. Request a quote →
Have a similar project?
Send us your drawings and programme, and we will come back with a quotation.