Fairway, Carshalton: a 9-metre, 1,800 kg beam
2,500 kg of structural steel fabricated and delivered, including a single 9 m beam weighing 1,800 kg.
About this project
At Fairway, Carshalton SM5, Steelo was entrusted with the fabrication and delivery of 2,500 kg of structural steel, including a 9-meter-long beam weighing 1,800 kg. Precision and efficiency were at the core of our process, ensuring that all components were fabricated to the highest standards and delivered on time.
One of the biggest challenges of this project was the sheer size and weight of the beams, which made site logistics particularly complex. The structural engineer rejected a splice for the heaviest beam, requiring it to be transported in a single piece. This restriction meant that the beam could not be lifted over the house and had to be maneuvered through a tight access route to reach the rear of the property, where the extension was planned.
Steelo’s expertise ensured that every steel section was manufactured to exact specifications and prepared for installation. With our efficient production process and streamlined logistics, we delivered the steel promptly, providing the structural elements needed to keep the project moving forward.
While the challenge of moving the beams on-site required significant effort, our role in delivering high-quality, precision-fabricated steel ensured that the project remained on track. This case highlights the importance of carefully planned fabrication and reliable delivery, both of which are at the heart of Steelo’s service.
Delivery on time, driver very helpful like always.
Good service, we’ve been working together 8 years 🙂
Chris – New Comfort Ltd.

Project images


Similar work
Steelo Daily
See how we handle projects like this. Find out more →
More case studies
Browse other projects we have delivered. All case studies →
Send your drawings
Get a price for your own project. Request a quote →
Have a similar project?
Send us your drawings and programme, and we will come back with a quotation.