Ferry Lane, Shepperton: new steel in an existing house
Structural steel supplied, fabricated and installed for a major residential redevelopment, tying a new steel frame into retained parts of the original building.
About this project
Steelo supplied, fabricated and installed the structural steel package for a substantial residential redevelopment project on Ferry Lane, Shepperton, involving major structural alterations to an existing property and the introduction of a new steel framework.
The project required the integration of new structural elements with retained sections of the original building, creating the supporting framework for the redesigned internal layout and roof structure.
For this project, Steelo fabricated and installed 36 structural steel beams and members, with 121 individual fabrications, forming a steel package weighing approximately 4.63 tonnes.
The steelwork incorporated a combination of universal beams (UB), universal columns (UC), square hollow sections (SHS) and steel flitch plates, together with bespoke welded connections, stiffeners, base plates and bolted assemblies.
Particularly notable were the cranked steel members and spliced connections, which required careful fabrication to accommodate the proposed structural geometry and facilitate installation within the existing building.
To support the accuracy of the fabrication process, Steelo worked with a trusted surveying partner to undertake a 3D laser scanning and point cloud survey, capturing the existing building geometry and producing detailed 3D drawings to assist with steelwork coordination.
Steelo managed the fabrication, delivery and on-site installation of the steelwork, ensuring the new structural framework could be integrated with the retained building elements.
The completed steel package provides essential structural support for the redevelopment, demonstrating Steelo’s ability to deliver complex residential steelwork packages, combining modern surveying technology, precision fabrication and specialist installation expertise.
When working with an existing building, even a small dimensional discrepancy can create significant challenges during steel installation.
Unlike new-build construction, where structural elements can be set out against a newly established grid, residential redevelopment projects must often accommodate existing walls, irregular dimensions and structural elements that may not precisely match the original drawings.
For the Ferry Lane project, Steelo worked with a trusted surveying partner to undertake a 3D laser scan and point cloud survey of the existing property before fabrication.
The scanning process captured millions of measurement points, creating a detailed digital representation of the building’s existing geometry. This information was then used to produce accurate 3D drawings, helping the fabrication team understand how the new structural steelwork would interface with retained sections of the property.
This approach is particularly valuable where the design incorporates cranked beams, complex connections and steel members that must fit precisely within an existing structure.
By identifying dimensional constraints before steelwork reaches the fabrication stage, 3D surveying can help reduce the risk of site modifications, installation delays and unnecessary material waste.
For projects involving substantial structural alterations, combining accurate digital surveying with specialist steel fabrication and installation provides a more coordinated and efficient approach to construction.
At Ferry Lane, this collaboration helped support the transition from the existing building to its new structural framework.

Project images


Similar work
Steel beam installation
See how we handle projects like this. Find out more →
More case studies
Browse other projects we have delivered. All case studies →
Send your drawings
Get a price for your own project. Request a quote →
Have a similar project?
Send us your drawings and programme, and we will come back with a quotation.