Steelo  /  Case studies  /  Kensington Roof Gardens
Case study

Kensington Roof Gardens: 60 tonnes of complex steelwork

60 tonnes of structural steel for Arcacia Limited, including dual-radius curved beams and many connection points that needed careful planning.

Commercial60 tonnesCurved beams
The project

About this project

For this project, we delivered 60 tonnes of structural steel fabrication for Arcacia Limited at the Kensington Roof Gardens. The complex steel framework was meticulously detailed and fabricated for a major construction project. This structure highlights Steelo’s expertise in managing intricate designs, incorporating challenging elements such as dual-radius curved beams and numerous connection points that demanded careful planning and precise execution.

Steelwork at Kensington Roof Gardens
What the client said

“We have worked with Steelo for many years on both large and small projects. They have always been excellent to deal with both in terms of design coordination but also the efficiency and speed at which the steel is delivered to us. The projects have varied in complexity. The Roof Gardens was by far the most complicated thus far in terms of both engineering but also logistics and split deliveries. Steelo dealt with all of this superbly. It is fair to say that Arcacia have never needed to look for another supplier”

Emma Fyffe Project CoOrdinator Arcacia Consulting Ltd
Gallery

Project images

Kensington Roof Gardens steelwork
Kensington Roof Gardens steelwork
Related

Similar work

Commercial steel installation

See how we handle projects like this. Find out more →

More case studies

Browse other projects we have delivered. All case studies →

Send your drawings

Get a price for your own project. Request a quote →

Your project

Have a similar project?

Send us your drawings and programme, and we will come back with a quotation.

X

contact IconGet in touch

Request A Quote

    Message us