The Lane: 30 tonnes behind a retained façade
Nearly 30 tonnes of straight beams up to 19.15 m long for a building close to Abbey Road Studios, where the existing façade had to be kept.
About this project
The nearly 30-tonne steel project was a challenging and exciting undertaking for our team. The structure consisted entirely of straight beams, including various sizes with weights ranging from 259 kg to 2803 kg and lengths up to 19.15 meters.
This project posed a unique challenge for the contractor due to the requirement to maintain the existing façade of the building located close to Abbey Road Studios.

“I can confidently say that Steelo are one of the best fabricators on the market. We’ve worked with Steelo on numerous projects and they have always delivered exceptional results. Most recently, they were instrumental in completing yet another successful project, providing precise structural steel fabrications that were of the highest qualitv Their ability to deliver on time, has been crucial in helping us maintain our project schedules. The prompt delivery of materials to site allows us to plan and execute our projects smoothly and without any delays. Steel’s attention to detail and precision in fabrication always ensures that all components fit perfectly, which reduces our installation time and helps to keep everything on track.
I highly recommend Steelo to anyone in need of a trustworthy and dependable steel fabricator”
Gregory Horodenski Smart Conversion Ltd
Project images


Similar work
Steelo Large
See how we handle projects like this. Find out more →
More case studies
Browse other projects we have delivered. All case studies →
Send your drawings
Get a price for your own project. Request a quote →
Have a similar project?
Send us your drawings and programme, and we will come back with a quotation.