Walworth bus depot: gantry for electric bus charging

A bespoke steel gantry fabricated and installed to carry DC fast chargers for Abellio London’s electric buses at its Walworth depot.

CommercialGantryInstallation
The project

About this project

As London accelerates towards a zero-emissions future, Steelo was proud to play a key role in delivering the structural framework supporting Abellio London’s latest electric bus charging infrastructure. Tasked with fabricating and installing a bespoke gantry system, Steelo helped enable overnight charging at Abellio’s Walworth depot—supporting Transport for London’s (TfL) 2035 target for a fully electric bus fleet.

Abellio required a space-efficient, high-capacity solution to support the charging of 34 new electric buses operating on routes C10 and P5. With limited space, restricted grid capacity, and a 24/7 operational environment, the project demanded meticulous planning and precise execution.

Steelo detailed and fabricated a custom steel gantry to support multiple DC fast chargers, each capable of delivering over 80kW. The gantry’s structure had to be both robust and adaptable, accommodating retractable charging heads to maximize operational flexibility.

Installation involved lifting 12-meter beams to a height of six metres, requiring external transport and specialist lifting equipment, including a spider crane. A temporary support frame was also devised to stabilize existing infrastructure throughout the process.

Despite the challenges, Steelo delivered the project on schedule and to spec—ensuring Abellio’s electric fleet could begin charging immediately. The gantry not only provides a structural backbone for charging equipment but also integrates seamlessly into a live depot environment without disrupting daily bus operations.

Steelwork at Walworth bus depot
What the client said

“We had just five days to complete the installation with only three parking bays available for storage,” said Kate Ustianowska, Technical Estimator at Steelo. “Every day, we had to completely demobilize, then remobilize our kit the next morning. It was a tight turnaround under complex conditions.”

“This was one of the most interesting and rewarding projects I’ve worked on,” added Kate. “It pushed us to collaborate across disciplines and adapt quickly, which is exactly what Steelo thrives on.”

Gallery

Project images

Walworth bus depot steelwork
Walworth bus depot steelwork
Related

Similar work

Access platforms and gantries

See how we handle projects like this. Find out more →

More case studies

Browse other projects we have delivered. All case studies →

Send your drawings

Get a price for your own project. Request a quote →

Your project

Have a similar project?

Send us your drawings and programme, and we will come back with a quotation.

X

contact IconGet in touch

Request A Quote

    Message us