Woodgate Crescent: steel for an occupied home
A complex steel package detailed, fabricated and supplied for a large extension to an occupied house with restricted access.
About this project
This project involved the detailing, fabrication, and supply of a complex structural steel package for a large residential extension. The work was carried out for an occupied property with restricted access and a tight construction programme.
The scope included a detailed review of the architect’s and engineer’s drawings, followed by the preparation of fabrication drawings and connection details for approval. Once approved, our team fabricated over 5.58 tonnes of structural steelwork, including UC beams, stub columns, cranked beams, kinked angles, and associated plates. All items were precision cut, drilled, welded, and fully primed for corrosion protection.
The completed steel package was scheduled and delivered to site in line with the contractor’s programme, ensuring the materials were ready for installation as soon as the builder required them.
In total, more than 100 hours of workshop time were dedicated to producing the package. The result was an accurately fabricated, fully primed steel frame delivered on time and in full, allowing the contractor to proceed with installation without delay and keeping the build on schedule.

“For almost 10 years Steelo has been supplying beams for my projects. From single beams to entire roof structures or entire floor structures. They are always there to help and deliver beams on time.”
Cezary Tworek
Project images


Similar work
Steel for home extensions
See how we handle projects like this. Find out more →
More case studies
Browse other projects we have delivered. All case studies →
Send your drawings
Get a price for your own project. Request a quote →
Have a similar project?
Send us your drawings and programme, and we will come back with a quotation.